Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: Other (infrastructure-related) |
Tags: | None |
Date time: | 10.48am, Saturday 5th January, 2008 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | timbo |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | Tim Burford |
Area: | Cambridge |
Trumpington Road crossing (on route to Addenbrookes)
Comments reflect the views of the original submitter only.