Add to Gallery: | Add this photo to a Gallery |
Category: | A general photo.: Other (infrastructure-related) |
Tags: | None |
Date time: | 5.53pm, Saturday 6th September, 2014 |
Time line: | Earlier | Later |
Facing: | Bearing of 312° |
Added by: | josmougn |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Massy palaiseau la piste cyclable fait un détour par la Cerisaie il faudrait qu'elle passe sous ce pont le long du TCSP de polytechnique
Comments reflect the views of the original submitter only.